Indotudi
English

INDONESIA · WEST JAVA · SUKABUMI CIKEMBAR

Build your factory in Indonesia. One team handles all of it.

Land, PT PMA registration, TKDN / SNI certification, KITAS work permits, construction — from your first site visit to your first shipment, we do the whole thing.

20 min
from the Cibadak toll gate
SHM
Indonesia's strongest land title
Built already
former plywood mill, ready to convert
Aerial view of the 20,630 m² industrial plot in Cikembar, Sukabumi, Indonesia, with a yellow boundary marking edges of 152 m, 84 m, 173 m, 92 m and 80.31 m
20,630This month's featured land · SHM freehold title
Kevin of the Indotudi team

Who you will work with

Kevin and his Indonesian team, with you the whole way

From your first site visit to the first shipment off the line, you deal with the same people throughout. Land, licences, certification, visas, construction — this is the team that runs them every week, and the same people answering you on WeChat and WhatsApp. You are never handed off to a third party.

Where you are

The orders are still there. The factory can no longer stay where it is.

Almost every owner who calls us gives the same three reasons.

Tariffs and country of origin

Buyers in the US and EU now order by origin. The same goods shipped from China and shipped from Indonesia face different duties, different scrutiny and different procurement policies.

Costs climb every year

Labour, social insurance, power and environmental compliance all move one direction — and they press on exactly the few points of margin you have left.

Your customers are pushing you offshore

"Do you have a plant in Southeast Asia?" is now a line on the supplier questionnaire. Answer no and you do not reach the next round.

This month's featured land

Sukabumi · the former Cikembar plywood mill

The former PT Albasia Jaya plywood mill, no longer operating. The site carries a long-span steel-frame building, a concrete hardstand and supporting structures, fronts the main road, and can be converted as it stands.

Plot details

Total area
20,630 m² (land including buildings)
Title
SHM — Indonesia’s strongest form of ownership
Condition
Former plywood mill, currently idle
Address
Jl. Pelabuhan II KM 19.9, Dusun Simpenan, Desa Cikembar, Kec. Cikembar, Kab. Sukabumi, Jawa Barat
Motorway
About 20 minutes’ drive from the Cibadak toll gate
Export port
About 130 km to Tanjung Priok (Jakarta, the main container port) — roughly 3 hours via the Bocimi toll road
Airport
About 150 km to Soekarno-Hatta International (CGK), Jakarta — roughly 3.5 hours by road
Orientation
Plant faces south
Boundary
152 m · 84 m · 173 m · 92 m · 80.31 m (irregular polygon)
Surroundings
Established industrial stretch, with factories and a gas depot already along the main road
Coordinates
-6.961607, 106.784837 (paste straight into any map app)
Price
On request
Open in Google Maps

Site photographs

Not the right fit? We will find you another.

This is not the only plot we hold. Tell us the size, location, industry and budget you need — we will search what we have.

Contact

Going it alone

Here is how the solo trip to Indonesia usually ends

Not for lack of money. Every step catches on a detail you cannot see from abroad.

  1. 7 plots viewed

    Not one title is clean

    SHM, HGB and Girik all mixed together. The seller says the transfer is straightforward; your lawyer finds an inheritance dispute, or land that was never zoned for industry.

  2. 3 weeks lost

    Registration stalls on capital and business codes

    PT PMA capital thresholds, KBLI business codes, the OSS filing system. Three consultants quote three prices and none of them can say which step is genuinely required.

  3. Six-month queue

    Certifications run one after another

    SNI, TKDN and K3L each have their own process and their own authority. By the time the certificates land, the customer has placed the order elsewhere.

  4. Idle plant

    Your engineers cannot get in

    You need eight people on site to install and commission. The visas are refused. The machines have arrived, the building is finished, and nobody may legally switch it on.

  5. Budget doubled

    The contractor reprices mid-build

    Three rounds of drawings, steel goes up, the schedule slips four months. The money runs out with the building half finished.

Three months gone, a lot of money spent, and still no factory.

Why Indonesia, why now

This is not betting on a trend. It is joining a move already under way.

Your competitors went early. Every figure and project below is public record.

285 million
people, fourth largest on earth

2025

16th
largest economy, biggest in Southeast Asia

GDP around US$1 trillion

About 5%
GDP growth

first half of 2025

No. 1
nickel producer, about 21% of world reserves

upstream of the EV supply chain

Who is already there

  • BYD

    Subang, West Java

    A roughly US$1 billion vehicle plant, 150,000 units a year planned, and an expected 18,000 jobs.

  • CATL

    with Indonesian state enterprises

    A US$6 billion partnership signed in 2022 spanning nickel mining, refining, battery manufacturing and recycling.

  • Tsingshan

    Morowali, Central Sulawesi

    The IMIP estate covers around 4,000 hectares and is Asia’s largest nickel processing complex.

  • Huayou Cobalt

    Morowali

    Its HNC hydrometallurgical project runs steadily, above nameplate capacity.

These are publicly reported investments in Indonesia, listed here only to show the direction of the industry. They are not clients of ours, and nothing here implies any endorsement by them.

Indonesia vs Vietnam

Vietnam looked irresistible three years ago. Run the numbers again.

If you are only starting to pick a site now, you are no longer buying at the old price. Five things worth putting through your own calculator.

  • Vietnamese land is still climbing

    Industrial park rents in northern Vietnam are forecast to rise about 5–9% a year through 2024–2026, and 3–7% in the south. The people who went early locked in the cheap rate; what is left for you is the price after the increase.

  • The wage gap is real

    Average gross pay runs about IDR 3.5 million a month in Indonesia (roughly US$195) against about VND 8 million in Vietnam (roughly US$315) — about 40% lower in dollar terms. (Whole-economy averages, not industry-specific; use them for order of magnitude.)

  • You are not only exporting

    Indonesia has 285 million people at home, close to three times Vietnam’s roughly 100 million. The same line here can serve export and domestic orders at once; in Vietnam the domestic side is far smaller.

  • The raw material is under your feet

    Nickel, bauxite, steel and the downstream smelting are all local, and so is the policy pushing processing onshore. For renewables, metalwork and electronic structural parts, the supply chain is one leg shorter.

  • Procurement rules become your moat

    Local-content requirements like TKDN are a barrier to competitors still sitting offshore, and an advantage once you manufacture here — government and state-enterprise buyers must give preference to products that meet the threshold.

How it works

From landing at the airport to your first shipment

Every marker below is a pace we have actually worked, not a best case.

  1. Day 0

    Site visit

    We meet you in Jakarta and walk the shortlisted plots within two days — measuring on site, checking the power connection, the access road, and what the neighbours manufacture.

  2. Week 2

    PT PMA registration

    We fix the KBLI business code and capital structure, then clear the notary, NIB, NPWP and OSS filings in one pass so the company can invoice.

  3. Month 1

    Land transfer

    Title due diligence, conversion of SHM into the HGB right a company may lawfully hold, and all taxes and notarisation handled for you.

  4. Month 3

    Construction

    Steel-frame plant, warehouse, offices and dormitories. Fixed lump-sum contract, paid against milestones, with no mid-build additions.

  5. Month 6

    Certification, in parallel

    TKDN, SNI, K3L, ISO, K3 and the environmental assessment all move at once, rather than queueing one behind another.

  6. Month 9

    Production

    KITAS in hand, your engineers legally on the floor, machines commissioned, and the first batch off the line.

Real timelines depend on your industry, the plot and the authorities’ own scheduling. The above is the rhythm we typically see, not a commitment.

What we do

Five jobs, one team, one quotation

You do not manage five suppliers at once, and you do not explain your plan five separate times.

Land

Sourcing industrial land, title due diligence, negotiation and transfer.

  • Sourcing and shortlisting plots
  • SHM / HGB / Girik title checks
  • Survey and boundary confirmation
  • Transfer, taxes and notarisation

Company and licences

A PT PMA foreign-owned company, from nothing to invoicing and importing.

  • PT PMA registration
  • KBLI business code planning
  • NIB business identification number
  • OSS filings
  • NPWP tax number
  • API-U / API-P importer identification
  • Persetujuan Impor import approval
  • Notaris
  • Help opening a bank account

Certification

The certificates you need to import, sell and bid — all of them, together.

  • TKDN local content certification
  • SNI mandatory certification
  • K3L safety and environmental registration
  • ISO 9001 / 14001 / 45001
  • K3 occupational safety
  • Environmental assessment (AMDAL / UKL-UPL)
  • Halal certification (food, cosmetics and other applicable sectors)

People and visas

So your staff may legally stay, and legally work.

  • RPTKA foreign worker plan
  • IMTA work permit
  • KITAS limited stay permit
  • KITAP permanent residence
  • Dependant visas
  • Renewals and annual reporting

Construction

The building, from drawings to handover.

  • Plant and warehouse design
  • Steel-frame construction
  • Offices and dormitories
  • Fire safety and power connection
  • IMB / PBG building permits
  • Completion and handover

KITAS work permits

You can ship the machines. You cannot ship the people.

Indonesia does not permit foreign nationals to work on a tourist visa. To send your own engineers to install, commission and train a line, you must go RPTKA → work permit → KITAS. Miss this step and everything you have already spent sits waiting at the gate.

  1. 1

    RPTKA

    File the foreign worker plan with the Ministry of Manpower: roles, headcount, duration and how local staff will be trained.

  2. 2

    Work permit and levy

    Pay the DKP-TKA foreign worker compensation levy and obtain the work permit.

  3. 3

    KITAS

    Immigration issues the limited stay permit, usually for 6 or 12 months, renewable.

  4. 4

    After arrival

    Reporting, renewals and dependant visas — and conversion to KITAP permanent residence once the conditions are met.

We handle it per head at a fixed fee and give you the full document list once, so your people are not chasing missing paperwork from home. Typically 4–8 weeks end to end.

Ask us about KITAS
Inside the Cikembar plant: long-span steel-frame structure, concrete floor and a clear column-free span

Industries

Lines we have built and certified

What clients are building right now: solar cells and PV modules, LED video walls (videotron), and interactive smartboards. We can handle the building, certification and permits for everything below.

Renewables and solar

  • Solar cells
  • PV modules
  • Inverters
  • Battery energy storage (BESS)
  • Lithium battery packs
  • EV chargers
  • Solar street lighting

Display and smart devices

  • LED video walls (videotron)
  • Interactive smartboards
  • Commercial displays
  • Touch modules
  • Digital signage

Electronics manufacturing

  • PCBA / SMT assembly
  • Wiring harnesses and connectors
  • Power adapters
  • Consumer electronics assembly
  • Security cameras
  • Smart meters

Steel and metals

  • Steel processing and warehousing
  • Sections · plate · coil
  • Prefabricated steel structures
  • Galvanising and surface treatment
  • Metal stamping
  • Steel import and trading

Electrical and infrastructure

  • Cable and wire
  • Transformers
  • Switchgear
  • LED lighting and street lights
  • Fibre optic cable
  • Data cabinets

Appliances and finished goods

  • Air conditioning
  • Small appliances
  • White goods
  • Electric two-wheelers

Do not see your product? The process is the same — land, certificates, people, building. Just ask.

About us

An Indonesian team, doing Indonesian paperwork

One counter instead of five

Land, notary, certification, immigration and construction are what we do every week. You are not coordinating five suppliers, and not re-explaining your plan to each of them.

We are not middlemen

We walk the plots and check the titles ourselves. Where a plot has a problem we will tell you not to buy it — selling someone a disputed piece of land is not business we want.

Certification is our day job

TKDN, SNI, K3L and ISO are not subcontracted out. Our own team files them, which is why we can tell you what each one is currently queueing on.

Mandarin interpreters: we make the introduction

Our team is Indonesian. When you need a Mandarin interpreter to walk sites, negotiate or visit government offices with you, we introduce you to freelance interpreters who studied in China. They do more than translate — they know where to eat in Jakarta, where to take a client to dinner, and where to go afterwards when the evening calls for it.

Usually arranged same-day across greater Jakarta (Jabodetabek).

FAQ

The questions owners ask first

Can a foreigner buy land in Indonesia?

A foreign individual cannot hold SHM. The correct route is to register a PT PMA foreign-owned company first, and have the company hold HGB (right to build) or another right available to a legal entity. We convert the title into a form the company can lawfully hold before transfer. This is standard practice.

How much capital does a PT PMA need, and is that money hard to clear?

The usual requirement is total investment above IDR 10 billion excluding land and buildings, with IDR 10 billion issued and paid-up capital, varying by KBLI business code. In practice the sticking point is not the figure — it is opening the foreign-owned account, getting the funds in, and producing the capital verification. We work with banking partners we deal with regularly and walk that stretch with you, so it rarely becomes the bottleneck people expect.

What is TKDN, and how high does my product need to score?

TKDN (Tingkat Komponen Dalam Negeri) is Indonesia’s local content certification, calculated product by product across local materials, local labour and local equipment. It matters in three ways. First, under Perpres 12/2021 government and state-enterprise buyers must give preference to products scoring at least 25%, and where products exist that reach a combined 40% of TKDN plus corporate benefit value (BMP), anything below that generally does not make the shortlist. Second, listing on the LKPP e-Katalog — the main gateway to public procurement — normally requires a TKDN certificate. Third, in electronics the practical range is usually 25–40%, which local assembly plus some locally sourced structural parts will typically reach. We run your bill of materials first and tell you how far off you are and whether the gap can be sourced in Indonesia.

I make electronic products. Which certificates do I actually need?

It depends on the product. Products on the mandatory list need SNI. Consumer goods outside the mandatory SNI list usually need K3L registration. Selling to government or state enterprises means TKDN. The factory itself needs K3 occupational safety and an environmental assessment. Halal applies mainly to food, drink, cosmetics and pharmaceuticals — ordinary electronics do not need it, and we will not bill you for a certificate you cannot use. Anything with a radio goes through a separate telecom approval track, and we will tell you which filings your specific model needs.

Can you handle steel?

Yes — processing, prefabrication, galvanising and warehousing, and import trading too. Be aware steel is tightly regulated: most steel products carry mandatory SNI, importing requires API-U / API-P and an import approval (Persetujuan Impor), and some categories need pre-shipment inspection. We file all of it.

How long does registering a PT PMA take?

With complete documents, from notary to NIB is typically 2–3 weeks.

How long does a KITAS take, and how many foreign staff can I bring?

RPTKA through to KITAS is typically 4–8 weeks, depending on the role and how the authorities are scheduling. There is no single cap on headcount, but it has to match your local staffing ratio, the nature of the roles and what you filed in the RPTKA. Management and technical positions are approved readily; general operator roles are not.

What can the Cikembar plot be used for?

It was already a factory site and has both a building and a concrete hardstand, so assembly, warehousing or light industry are the most direct conversions. The intended use must match the local RTRW spatial plan, which we verify for you before you negotiate a price.

How do you charge?

Licensing, certification, KITAS and construction are quoted per project — itemised before you sign, with no additions afterwards. For land, we set out the commission arrangement in writing before you view anything, and we only move forward once both sides have agreed it. Nothing appears at the end that was not on the table at the start.

I am abroad — can I see the land first?

Yes. We put together the full set of site photographs, plot dimensions, title documents and notes on the surroundings and send it over by WeChat or email. If you want someone to travel out and film or fly a drone specifically for you, we can arrange that as a paid service, quoted upfront.

Do you have plots other than this one?

Yes. This one is the featured plot this month; we hold others, and we can approach owners of land that has not been listed. Tell us the area, location, industry and budget.

Can you communicate in Chinese?

Yes. On WeChat and WhatsApp we reply in Simplified Chinese or English. When you need a Mandarin interpreter on site, we introduce you to a freelancer who studied in China.

Next step

Read the pack first. Decide about the flight after.

Tell us what you need.

Free: the complete site photographs, dimensions, title documents and area notes for the featured plot

We reply in Simplified Chinese or English.

WeChat

Copy it, search for it in WeChat, or scan the code below from another phone.

WeChat — Indotudi
Talk to us